DDU-GKY 2.0 Quality Appraisal / Due Diligence Document Checklist

  • Home
  • DDU-GKY 2.0 Quality Appraisal / Due Diligence Document Checklist
 

 DDU-GKY 2.0 Quality Appraisal / Due Diligence Document Checklist

(As per SOP 2025, Ref. SF 2.3A, SF 2.3A1, SF 4.2O, SF 4.2P, SF 4.2Q)
A. Project Execution Readiness (Head Office / Project HQ level)
(Ref SOP Ch 2 → SF 2.3A & 2.3A1)
#
Document / Evidence
Remarks
1
Organisational structure covering MIS & Planning, IEC, Content Development, Operations, Placement, Call Centre/Tracking, ERP, Quality Assurance, HRM & Finance
Mandatory proof of functional departments
2
Job Descriptions and Specifications for all key roles (Project Head, Q-Team Head, Finance Head, MIS Head etc.)
3
Appointment letters and qualification proof for key project personnel
4
Evidence of induction / orientation on DDU-GKY guidelines and SOP
Attendance sheet or certificate
5
SOP training / certification records of staff
6
Evidence of bilingual Training Content & TLM (English + local language) for all courses
7
Trainer ToT Certificates and qualification proof
8
ERP system screenshot / description showing live data tracking and exception reports
9
Organisational policies on audit, placement support, and quality assurance
10
Bank details of dedicated DDU-GKY project account & CA-certified fund flow statement
 
B. Training Centre Due Diligence Documents
(Ref SOP Ch 4 → SF 4.2O & SF 4.2P)
1. Basic Centre Information
  • Address and layout plan of training centre and hostel (if residential)
  • Training Centre Name Board (SF 4. 2B) and Hostel Board (SF 4.2C)
  • Ownership / Lease agreement (valid ≥ 3 years)
  • Electricity bill / connection proof
  • Fire Safety certificate and Building fitness certificate
2. Infrastructure and Look & Feel (as per SF 4.2A – 4.2N)
  • Furniture & fixture list (classroom, lab, counselling room, dining area, toilets)
  • CCTV installation proof (with recording system)
  • Biometric attendance machine installation evidence
  • Internet connectivity proof (speed test / bill)
  • Information Boards (academic, living area, student entitlement, food specs, code of conduct etc.)
  • Signage and safety boards (No Smoking, No Littering etc.)
  • Fire extinguisher and first aid arrangements photos
3. Domain Lab and Training Facilities
  • Domain equipment list as per NSQF QP/NOS
  • Tool kits and raw materials availability record
  • IT equipment details (computers, printer, projector, etc.)
  • Training material / handouts samples
4. Human Resources
  • Trainer profiles & qualifications as per SSC/NCVET norms
  • Trainer ToT certificates (if available)
  • Staff attendance register & payroll proofs
5. Residential Facilities (SF 4.2P)
  • Accommodation details (beds, wardrobes, washrooms)
  • Dining area with menu and food quality certificate (if any)
  • Sanitation facilities with gender segregation evidence
  • Hostel warden details & contact display board
  • Safety and grievance redressal contact board displayed
C. Mobilisation and Candidate Readiness Documents
(Linked with SF 2.3A and Ch 3 Mobilisation Process)
  1. Mobilisation plan and district-wise target list
  2. Candidate registration and screening forms
  3. Parent consent forms and BPL/Category certificates (if applicable)
  4. Photographs of mobilisation events and camp activities
  5. Batch formation and counselling records
D. Minimum Readiness for Start of Training
(Ref SF 4.2Q – Bare Minimum Items to Start Training Pending SRLM Visit)
  • Approved Project Commencement Order (PCO)
  • Approved Project Execution Readiness Form (PER)
  • Training centre furnished and functional as per SF 4.2O & 4.2P
  • Biometric & CCTV functional
  • All mandatory boards displayed (SF 4.2A – 4.2N)
  • Trainer and Quality team onboarded with proofs
  • Candidate mobilisation underway with documentation
E. SRLM / Quality Visit Checklist
During the appraisal visit, SRLM officers will verify:
  • Original documents listed above (both hard copy and uploaded on Portal)
  • Compliance with Look & Feel standards (SF 4.2A–4.2N)
  • Cross-verification of trainers, biometric, and infrastructure
  • Verification of centre branding and DDU-GKY visibility norms
  • Submission of PIA Q-Team Due Diligence Report on Portal